Permits and land use applications

Planning a project and need permits and/or city approval? Find the forms you’ll need as a homeowner, contractor, developer, or other type of applicant.

About the permitting process

How to apply

Use our online permitting portal to apply for and manage permits.

Required documents

Each permit has its own forms you’ll need to fill out and then upload to the portal. You can find those forms on this page.

For more information on preparing forms and other documents, see our General Standards for Electronic Documents(PDF, 155KB) handout.

Steps in the permitting process

For a detailed diagram on the permitting process, see our Permit & Land Use Application Process(PDF, 119KB) handout.

How long it takes to approve a permit

Our reviews may take more or less time depending on:

  • Quality of documents
  • Permit type
  • Project size
  • Site conditions

To check the average number of business days it takes to approve each type of permit, see our Permit Time Estimate Sheet(PDF, 80KB).

When permits expire

To find out how long each permit is valid, see our Permit Expiration(PDF, 204KB) handout.

Checklists

Land use

Note: Certain land use applications require a pre-application meeting.

Engineering

Permit checklists

Bonds

Other forms and information

Fees 

Traffic mitigation fee

For all new developments and change-of-use buildings that affect traffic, you’ll need to calculate fees according to the latest edition of Trip Generation Manual, Institute of Transportation Engineers. For more information, see the following documents: 

Performance/maintenance bond

For proposed stormwater facilities: To ensure construction finishes in a professional and timely way, you’ll need a performance bond. 

We’ll review your Bond Quantity Worksheet(XLSX, 46KB) based on standards in the latest editions of:  

 

 

Fire

For fire applications and checklists, visit the Puget Sound Regional Fire Authority (RFA) website.