For total building demolition, at the time of the final inspection, all utilities shall be disconnected and capped within five (5) feet of the property in accordance with the serving utilities accepted practices.
** The PSCAA requires advanced notification for structures to be demolished with a projected roof area greater than 120 square feet and/or asbestos projects disturbing 10 linear feet and/or 48 square feet or greater of asbestos containing material in Pierce, King, Kitsap, and Snohomish counties. Federal regulations have similar requirements. Please contact PSCAA to obtain a NOTIFICATION DETAILS FOR CASE at pscleanair.gov.