Every application shall include the location of the proposed right-of-way use, a description of the use, the planned duration of the use, applicant contact information, and all other information which may be required as specified in the procedures adopted under this chapter, and shall be accompanied by payment of the required fees. (SMC11.10.090.B)
All applications for permits will be submitted at least fifteen (15) days before the planned need for the permit, or such greater period as may be reasonably required by the Director or designee. If unforeseen conditions require expedited processing the City will attempt to cooperate, but additional fees to cover additional costs to the City may be charged. (SMC 11.10.090.E)