This application is for all land disturbing activities on a development site. Examples include but are not limited to clearing, grading, excavation, and installing drainage improvements. Examples include but are not limited to driveways, sidewalks, drainage connections, and trenching.
The following documentation must be submitted when applying for an STE (Clearing and Grading) permit:
A State Environmental Policy Act (SEPA) checklist may be required if the project is not exempt per WA 197-11- 800 and SMC 16A.23. Please contact the Planning Division if you have any questions on the SEPA process.
Allow a minimum of four (4) weeks review time for projects over 2,000 cubic yards.
If one (1) acre or more you will need a Department of Ecology NPDES NOI (Notice of Intent) for construction activity.