This application is for construction of new commercial, multifamily and single family residence with or without an Accessory Dwelling Unit (ADU) only. Building systems (mechanical, electrical and plumbing) are separate permits.
The following documentation must be submitted when applying for a new building permit (some information may not be required for your project):
Sewer availability certificate
Water availability certificate
Cross connection control form (Highline Water District)
Septic design plans approved by the King County Health Department if on a septic system
Legal documentation verifying parcel number
Communications Facility Supplemental Application
Accessory Dwelling Unit (ADU) registration form
Soils Report (Unless waived by the Building Official)
Site Plan. Include:
Civil Plans
Landscape and Irrigation Plan
Lighting Layout Plan
Architectural Plans (must be stamped and signed by a licensed architect and/or engineer for commercial projects)
Structural Plans (must be stamped and signed by a WA State Licensed Engineer)
Site - scale plans to most appropriate engineering scale, 1"=10' or 1"=20'
Architectural - plans must be drawn on a minimum paper size of 18"x24" with a minimum scale of 1/8"=1'
If a licensed architect or engineer is providing structural plans and calculations, they must be wet stamped.
Separate permits for mechanical, electrical, plumbing, and fire sprinkler systems are required.