Tenant Improvement

This application is for improvements/build out to existing tenant spaces in commercial buildings.

The following documentation must be submitted when applying for a tenant improvement permit:

Cross connection control form (Highline Water District)

Site plan, include:

  • All property lines, building(s), and adjacent streets
  • If you are changing the use of the building or space you must submit a parking lot layout and measurements for all accessible parking spaces
  • Square footage of the lot, building and tenant space

Architectural plans, include:

  • Complete description of work to be performed. Include a description of the use of the building and rooms, the occupant loads of the spaces, and the allowable areas of the building(s)
  • Floor plans with door and window locations and exitin paths shown
  • Stair details, and typical wall, ceiling, and floor sections
  • If converting unheated space into heated space, you must show compliance with the Washington State Energy Code

Structural plans, include:

  • Structural calculations
  • Foundation plans
  • Complete framing plans, to include roof, wall, and floor framing plans
  • Lumber dimensions, species, grade, spans and spacing
  • Wall, ceiling, and floor sections or provide a building cross-section