This project will be divided into two separate tasks:
This work includes resurfacing the asphalt roadway at the four locations. Generally, we plan to perform a 2-inch grind and overlay. In some areas, existing pavement conditions might require full-depth removal and replacement of the existing asphalt. We’ll update the existing pedestrian facilities needed to meet the Americans with Disabilities Act (ADA) requirements.
Work at location 1 will include replacing catch basins with manufactured treatment devices, installing a compost-amended vegetated filter strip, and repairing non-functional storm pipes.
Stormwater retrofit work at Locations 2 through 4 will be on a case-by-case basis.
For a project overview map and location maps, please see Exhibit A(PDF, 7MB).