2027 Overlays Project

  • Project typeResurfacing roadways
  • Project schedulePlanning

Locations

Location 1

  • Des Moines Memorial Drive (between South 136th and South 145th streets)
  • South 144th Street (from Des Moines Memorial Drive to 20th Avenue South)
  • 18th Avenue South (from South 136th Street to the end of the street)

Location 2

  • South 188th Street, from Military Road South to Tukwila city limits

Location 3

  • Intersection of South 216th Street and Military Road South

Location 4

  • South 170th Street, from International Boulevard to 31st Avenue South

Project goals

This project will be divided into two separate tasks:

Task A: Overlay work

This work includes resurfacing the asphalt roadway at the four locations. Generally, we plan to perform a 2-inch grind and overlay. In some areas, existing pavement conditions might require full-depth removal and replacement of the existing asphalt. We’ll update the existing pedestrian facilities needed to meet the Americans with Disabilities Act (ADA) requirements.

Task B: Stormwater infrastructure upgrades

Work at location 1 will include replacing catch basins with manufactured treatment devices, installing a compost-amended vegetated filter strip, and repairing non-functional storm pipes.

Stormwater retrofit work at Locations 2 through 4 will be on a case-by-case basis.

Project benefits

  • New asphalt overlay of streets
  • New stormwater conveyance and treatment infrastructure
  • ADA-compliant pedestrian facility improvements
  • Traffic signal upgrades

Project map

For a project overview map and location maps, please see Exhibit A(PDF, 7MB).