CURRENT AND PLANNED CONSTRUCTION
Click on this interactive map to find current and planned construction and development in the City.
Projects & Studies
Project extends light rail from the Angle Lake Station to the Federal Way Transit Center. The 7.8-mile extension includes three stations.
Station Area Pedestrian Improvements - South 176th St/32nd Ave South/S 180th Street
This project will study and recommend pedestrian safety improvement projects along the International Boulevard corridor, from South 152nd Street to South 216th Street.
The purpose of the study is to determine the highest and best configuration of the S. 200th Street corridor based on current usages demands, safety concerns, future transportation demands.
This study will be undertaken to guide future improvements to the functionality and safety of the intersection.
This citywide plan will propose strategies and measures to improve safety for all modes of transportation and guide future improvements.
Grind and Overlay asphalt pavement along South 154th St/South 156th Wy between Des Mns. Mem. Dr and 24th Ave S
Safer route for pedestrians, bicyclists & vehicles along 34th Avenue S., including sidewalks, planter strip, curb, gutter, bike lanes, curb extensions, pedestrian lighting, stormwater, and utilities.
The Long-awaited $1B extension of Highway 509 through SeaTac is finally under construction. This will extend SR 509 to I-5 near SeaTac and add a southern access point to Sea-Tac International Airport.
This project will provide safe pedestrian access to and from the new River Ridge Elementary School
The 34th Avenue S Phase 2 project will provide a safter route for pedestrians, bicycles, and vehicles traveling along 34th Avenue South between South 166th Street and South 176th Street.